top of page
Portfolio
For over 30 years our clients have appreciated the time and effort we always put into understanding their needs and our unyielding focus on energy efficiency.
Building Services MEP
Admiral Hotel
Aa MGallery Hotel located along Roxas Boulevard, Manila is a Collection of high-end hotels all around the Philippines.
Forsspac provides Full MEPF Testing and Commissioning Management and Witnessing under the Management Anchor Land Holdings, Inc.
Forsspac provides Full MEPF Testing and Commissioning Management and Witnessing under the Management Anchor Land Holdings, Inc.
Solaire North
Forsspac was engaged pre-concept to help with mass space planning.
The engagement continued through all design stages to construction documentation expressed in an LOD350 Revit model.
Hotel, retail and casino complex 216,000sqm
The engagement continued through all design stages to construction documentation expressed in an LOD350 Revit model.
Hotel, retail and casino complex 216,000sqm
Widus
Coordinating MEPF design consultant in conjunction with Atkins for the development from concept to final construction documentation from an integrated 3D model.
Widus Hotel, retail and casino complex, 124,000sqm, is the premier one-stop leisure destination in Clark Freeport Zone.
Widus Hotel, retail and casino complex, 124,000sqm, is the premier one-stop leisure destination in Clark Freeport Zone.
Acqua
MEP design consultancy for the 6th tower of this development which includes both a hotel (Novotel) and condominium units.
A 41 storey tower complex of 35,000sqm
A 41 storey tower complex of 35,000sqm
Aeon Tower
MEP design for this first truly high-rise development in Davao City comprising retail, BPO, hotel and residential condominium units.
33 storeys 101,000sqm
A particularly challenging project due to the re-purposing of the building during design.
33 storeys 101,000sqm
A particularly challenging project due to the re-purposing of the building during design.
Ericsson Office
150 seat office fit-out of 2,400sqm
Building due diligence, MEP design and as-built.
Full building services including testing, adjusting and balancing of all systems.
Building due diligence, MEP design and as-built.
Full building services including testing, adjusting and balancing of all systems.
Shell Solaris
MEP investigation of building condition, re-design and verification of system performance.
Complex project as the 3 floors were 9th, 16th and 25th all served by different systems but had to be adjusted be consistent and meet Shell international standard. In collaboration with Jacobs.
Complex project as the 3 floors were 9th, 16th and 25th all served by different systems but had to be adjusted be consistent and meet Shell international standard. In collaboration with Jacobs.
Banwa Island
MEP design, due diligence, project/construction management involving all buildings on the island.
Banwa is one of the most expensive island resorts in the world and it was a privilege to be invited to help complete this project.
Banwa is one of the most expensive island resorts in the world and it was a privilege to be invited to help complete this project.
Euroswiss Foods
MEP design, system investigation and re-design / retro commissioning to bring the facility up to full standards compliance.
Food production unit of 4,064sqm
Food production unit of 4,064sqm
MEP
3D Modeling (BIM)
Solaire Phase 1a
Working for Shinryo our team 3D modelled 151,000sqm, conducted clash detection and resolution. Final output being 2D ISD’s
Mayflower
Working for Greenfield Development Corporation our team produced the 3D Model and undertook clash detection/resolution plus 2D ISD’s.
A 97,000sqm project mixed use project of 27 storeys plus roof deck.
A 97,000sqm project mixed use project of 27 storeys plus roof deck.
Solaire North
Working for Sureste Properties our team took the detail design at LOD300 and developed it to LOD350 at construction documentation.
Model coordination was a challenge for the 216,000sqm development working with client engineers, SY^2 for structures and Aedas Architects.
Model coordination was a challenge for the 216,000sqm development working with client engineers, SY^2 for structures and Aedas Architects.
Casey Hospital
Working for Bestec our team produced the final 3D model from mark ups provided by client.
Melbourne Airport
Working for John Holland our team undertook the 3D model production from which 2D metal fabrication drawings were produced.
Our scope included the rationalisation of ductwork and fittings.
Our scope included the rationalisation of ductwork and fittings.
West Orange High School
Working for Matern our team took the LOD300 model and developed it to a very high level of detail pre-construction equivalent to LOD500.
91,000sqm project
91,000sqm project
Western Sydney Arts
Working for Statewide our team produced the 3D Revit model to clash free LOD400 from which the fabrication drawings were extracted.
City of Dreams Macau
Working for Leighton (Asia) Forsspac lead a team to produce the 3D/4D BIM model including spatial coordination for cost estimating and 2D construction documentation 500,000sqm, 47 storey project.
3D Room Viewer
See how easy it is to navigate a 3D model
3D Modeling (BIM)
Architectural Services
Amna Ibrahim Mosque
Working for MB Consulting our team took the concept and provided a full A&E service covering architectural production, structural and MEP services.
Verdana Residences
Working for NettletonTribe our team undertook architectural 3D Revit modeling and DA documentation. Followed by as-built production.
Wind Jammer Resort
Forsspac was commissioned by a private client to provide a full Architectural & Engineering Design for the project. This was followed by rendering and animation/walk through for the whole project.
Coffs Harbour Hospital
Working for MSJ our team produced the full architectural model in 3D Revit utilizing the dRofus plug-in to help production.
A 292 bed care facility.
A 292 bed care facility.
Auburn North School
Working for Conrad Gargett our team was engaged on the Auburn North and Rosehill Public School to produce the 3D architectural Revit model, Detail Design and IFC Documentation.
Infinity Towers
Working for Peck Von Hartel our team produced the architectural 3D Revit model, Detail Design and IFC Documentation.
60,000sqm over two towers, 20 & 22 storeys.
60,000sqm over two towers, 20 & 22 storeys.
St. Paul's Hospital
Working for P&T (Hong Kong) our team completed the design development and drawing production for this 450 bed hospital complex.
Whitford Shopping Mall
Working for PDC Group our team produced the 3D architectural model for the exterior cladding covering 2 levels and basement.
Mt Pleasant Hotel Extension.
The scope of work for the recently concluded project was to provide render visualizations for the extension of the hotel’s Bar Seating and Dining Area.
Architectural Services
Testing & Commissioning
Mpire Center
Mpire Center, located at West Avenue Quezon City is a 11-storey office building with one (1) basement, penthouse and pool deck having a lot area of 1,689.81 square meters and with a relatively flat terrain.
Forsspac commissioned all systems involved in the project including LEED system requirements:
Mechanical Ventilation and Air-conditioning System,
Electrical Distribution System,
Lighting Control System,
Water Distribution System.
Forsspac commissioned all systems involved in the project including LEED system requirements:
Mechanical Ventilation and Air-conditioning System,
Electrical Distribution System,
Lighting Control System,
Water Distribution System.
City of Dreams (Manila)
Hotel, casino, retail and entertainment complex of 300,000sqm
Forsspac provide full on site Testing & Commissioning of all MEP systems including IT.
Forsspac provide full on site Testing & Commissioning of all MEP systems including IT.
The Medical City
Forsspac delivered a comprehensive range of services, including Construction Management, Commissioning Management and Testing Adjusting & Balancing for this twin tower 800 bed facility.
Zuellig Building
LEED Platinum awarded building, 80,000sqm 33 storey building.
Forsspac provided LEED Commissioning Authority (CxA) services.
Forsspac provided LEED Commissioning Authority (CxA) services.
Solaire
Hotel, casino, retail and entertainment complex of 270,000sqm
Forsspac provide full on site Testing & Commissioning of all MEP systems including IT for both phase 1 and 1a.
Forsspac provide full on site Testing & Commissioning of all MEP systems including IT for both phase 1 and 1a.
Century Lifestyle Mall
Shopping mall complex of 88,000sqm
Forsspac provided Construction Management, Commissioning Management, Testing, Adjusting and Balancing services.
Forsspac provided Construction Management, Commissioning Management, Testing, Adjusting and Balancing services.
Bohol Airport
New Bohol Airport international airport designed to handle the increasing passenger influx to Panglao’s developing tropical destination resorts.
Forsspac is providing testing, adjusting, and balancing services for this project.
Forsspac is providing testing, adjusting, and balancing services for this project.
Ichthys LNG
ICHTHYS LNG project. LER/LIR Modules. A total of 26 modules built in Batangas and shipped to Darwin Australia.
Forsspac managed the HVAC works for the project, establishing works packaging and interfaces, project management and construction management procedures and documentation, engineering oversight, T&C Management, Testing Adjusting and Balancing (including specialist testing regimes) and technical support services.
Key challenge was compliance with the stringent bio-security standards.
Forsspac managed the HVAC works for the project, establishing works packaging and interfaces, project management and construction management procedures and documentation, engineering oversight, T&C Management, Testing Adjusting and Balancing (including specialist testing regimes) and technical support services.
Key challenge was compliance with the stringent bio-security standards.
Wynn Palace (Macau)
Wynn Palace Macau is a hotel resort casino development honoured with eight Forbes 5-star awards for its exceptional hospitality, fine dining and lavish spa.
Forsspac provided QA/QC services for the MEP building services installations.
Forsspac provided QA/QC services for the MEP building services installations.
MPTS Headquarters Building
A four-storey building with a gross floor area of 5,135 sq.m. It is designed to be the center of activity for all current and future concessions of MPT South.
Forsspac commissioned all systems involved in the project including LEED system requirements: Mechanical Ventilation and Air-conditioning System, Electrical Distribution System, Lighting Control System, Water Distribution System.
Forsspac commissioned all systems involved in the project including LEED system requirements: Mechanical Ventilation and Air-conditioning System, Electrical Distribution System, Lighting Control System, Water Distribution System.
Testing & Commissioning
Infrastructure
Clark International Airport
Located in Clark Pampanga having an area of 2,367 hectares in total.
Forsspac provides Full MEPF Testing and Commissioning Management and Witnessing under Luzon International Premier Airport Development Corporation (LIPAD).
Forsspac provides Full MEPF Testing and Commissioning Management and Witnessing under Luzon International Premier Airport Development Corporation (LIPAD).
Dubai Airport
Working for Thermo LLC our scope of work was to undertake the MEPF services coordination.
Target capacity for the airport was 70 million passengers per annum.
Target capacity for the airport was 70 million passengers per annum.
West Kowloon Terminus
Container Ports
Forsspac was retained by Asian Terminals to make a study of their terminals in Manila and Batangas.
The brief was to produce an electrical infrastructure redevelopment plan with a 25 year life.
The brief was to produce an electrical infrastructure redevelopment plan with a 25 year life.
Kowloon-Canton Railway
MEP Services coordination and change management covering 5 stations having a total ara of 3.3 million sqm.
Working for AMEC
Working for AMEC
Power Plant
Leighton engaged the services of Forsspac to provide full Architectural & Engineeing Design services for the power plant’s technical and non-technical buildings which consisted of seven non-technical buildings and fourteen technical buildings.
Tung Chung Station
Forsspac was engaged to undertake the MEP services coordination for this end of line station in Hong Kong.
GGLC master plan.jpg
Re-Bar
John Holland engaged Forsspac to undertake re-bar and form modelling in sufficient detail to facilitate the production of bending bar schedules suitable for the selected re-bar fabrication contractor.
Infrastructure
bottom of page